Commercial

PTC offer a range of commercial works from modernisation and alterations to new construction and fit-out.

We understand our clients requirements and are successful at achieving a professional and efficient projects.

Projects undertaken are for both Public and Private sector Clients and across a wide range specialising in design and build contracts. We provide cost effective construction to the highest quality with the knowledge and skills to introduce new technologies and innovative solutions. We can offer real value with plant and material solutions to meet a wide range of Clients needs to deliver an effective and efficient space, delivered with speed and minimum disruption.

  • Installation of a temporary access / crash protection deck & enclosure including suitable hoisting and crane system
  • Temporary works provided a safe means of access to undertake the works of stripping the existing external upper roof canopy areas
  • Installation of Rock panel soffit lining system together with new powder coated aluminium beam, fascia casings and air tight barrier system to enhance protection of the building

Shopping Centre, restaurants and Spinnaker Tower remained operational throughout.

Value: £750,000

  • Rectification of paving defects and replacement of non slip decking to the waterfront.
  • Removal of light fittings and drop bollard enclosures to Central Square & Plaza.

Refurbishment of existing retail unit and associated car park Bridgemead Retail Park.

  • New car parking areas and car parking overlay
  • New concrete slab, pavings, kerbing, brickwork, drainage, interceptors, rainwater storage and all markings including the removing and adapting existing surfaces
  • Installing bollards, litter bins and cigarette stubbing plates

Value: £347,687

Enabling works which include site surveys and installation of new full height resistant wall to segregate the project work area from the current GMP areas.

  • Installation of temporary hygienic tunnel and further segregation between construction work area which allows GMP personnel to access their work areas without entering any construction areas.
  • Alterations/removal of existing packing cubicles
  • Mechanical and electrical installation/removal ( including work in the existing plantroom and roof void above the work area)
  • Sprinkler installation
  • QBMS installation
  • Fire compartmentation installation
  • Suspended ceiling removal/installation
  • Existing floor refurbishment works
  • 1st /2nd Fix carpentry works
  • Decorations and finishes
  • New packaging line installation

Value: £693,000