Relocating Dreams Beds into approx. 8,000 sq ft of the existing demise and creating an additional unit in the remaining 4,000 sq. ft of floor space by the introduction of a new dividing wall and additional entrance for Unit G2 and new service door for unit G3.
Installation of the new Unit G2 customer entrance door and create western elevation including new glazing and entrance feature. New paving to the front of entrance.
New structural steel work to new entrance with new cladding and signage.
New roofing constructed at the new entrance with new downpipes draining.
New opening created for the 2.5mx2.5m roller shutter door and installation of additional fire escape.
Installation of internal stud party and blockwork wall.
New concrete floor slabs laid to new foundations and external flood lighting installed in carpark.
Existing paving extended in front of new Unit G2 customer entrance along with drop kerbs and tactile paving.
Ductwork and cabling for network to extend into the service intake location for Unit G3.