29 Berth – Quayside Reconstruction

Location of Works

The works were executed adjacent to 29 Berth area in Eastern Docks within the Port of Southampton.

The 13 week programme included:

Identification and diversion of existing services.

Traffic Management

Breaking up existing reinforced concrete and tar macadam paving.

Excavation and disposal of all material down to new formation level

Recycling of concrete, tarmac and existing sub base.

Dealing with contaminated material

Reinforced concrete slabs = 3238m²

Macadam surfacing = 427m²

Construction of new storm drain lines

Construction of new linear drain channels

Construction of new manholes, silt trap manholes and cable turning pits

Installation of ducts between turning pits

Removal of redundant services

Installation of electrical cables as specified by the bypass separator for the alarm.

Project Details

CLIENT: ABP
LOCATION: Southampton 
START DATE:
COMPLETION DATE:
VALUE:  £548,486