The section of trail involved was approximately 1.5km south of the North Hayling Halt Car Park and 1.5km of the Station Theatre
Description:
- Repair of damaged section of sea defences comprising 110m of new timber defences.
- Flood defence timber wall works.
- Construction of hardwood planks and posts.
- Installation of geotextile lining to sides.
- Construction of timber edgings.